Few projects

LOME PUBLIC WATER SUPPLY IMPROVEMENT PROJECT PHASE II (DECO)

Preliminary and Detailled design of 3 watertowers with capacities of 200m3 (Zossimé), 400m3 (Attiegou) and 1300m3 (Logoté)

  • Preliminary design of 3 watertowers

  • Detailed design for the watertowers

  • Production of all structural documents (calculation notes, formwork and reinforcement drawings and Cost Breakdown)

NEW HOME BUILDING PROJECT IN CHERBOURG-EN-COTENTIN

Detailed issue for construction design of structure of G+3 dwelling house

  • Modelling of the load-bearing masonry structure, supplemented by reinforced concrete and metal section reinforcements

  • Load specifications for the foundry

  • Production of detailed calculations, structural drawings and execution details

PORTO-NOVO BYPASS DEVELOPMENT PROJECT (BENIN) : ZOUNVI BRIDGE IN BENIN (DECO)

Design of deep bridge foundations during the construction phase

  • Resumption of modeling to extract load profiles

  • Creation of geotechnical models for foundation sizing

  • Production of calculation notes and issue for construction drawings including details

BOFFA MINERAL PORT CONSTRUCTION PROJECT (PACES_AGB2A-GIC)

Civil engineering and structural steel design of the project in the Preliminary Design phase

  • Project design in 3 development phases

  • Design of civil engineering structures (quay, buildings, steel sheds and external works)

  • Project costing for several quay variants

SCI LE CHATEAU A MANOSQUE PROJECT (AMCB - FRANCE)

Design of 2 sheds to be used as workshop and office in construction phase

  • Design of steel structures in seismic zones in accordance with Eurocodes

  • Dimensioning of sections, fasteners and ground anchors

  • Production of detailed calculation notes